Home / Jaw Modules Begin New Era in Workholding

Jaw Modules Begin New Era in Workholding

In this new multitasking modular system from Hainbuch, the chuck and jaw module do not just result in a jaw chuck, they become a quick change clamping solution for many applications that can be quickly changed to cover a large clamping range.

Posted: August 13, 2013

In this new multitasking modular system, the chuck and jaw module do not just result in a jaw chuck, they become a quick change clamping solution for many applications that can be quickly changed to cover a large clamping range.

This energy-efficient compact device solves big problems; it redefines jaw clamping and marks the beginning of a new era in workholding. Hainbuch (Germantown, WI) presents a jaw module that is small, flexible, that can be quickly changed, and covers a large clamping range.

 

 

Together the two partners, Spanntop chuck and jaw module, do not just result in a jaw chuck, they become a quick change clamping solution for all situations.

Mandrels and clamping heads can also be used in the basic unit. The new jaw module completes the circle and gives a new clamping dimension that opens up even more possibilities for users. All this with less weight and a smaller interference contour and the usual Hainbuch accuracy. In short: The perfect 3 in 1 combination – I.D. clamping, O.D. clamping, and jaw clamping.

The Hainbuch solution, consisting of a chuck and a jaw module, has nothing in common with the large, heavy, energy sapping big jaws that can be found in many machine shops; where their size is more of an obstacle than an advantage. These heavy chucks put load on the machine spindle and are slow to accelerate and decelerate losing time and using energy.

This takes longer for the part to be produced and hence makes it more expensive and also wears the machine bearings out quicker. This is squandering of energy and piece rate time in its purest form. Naturally these are costs that today no one can afford or want to pay.

Lets assume that someone purchases a lathe/milling machine with spindle taper DIN A2-6 65 mm bar capacity, here the workpiece range is usually diameter of 10 to 200 mm. To cover that range a machine with a 215 jaw chuck is purchased. However 80 percent of the components are in a clamping range of 100 mm and smaller.

The dilemma of having a large clamping device and a small workpiece is one that plagues manufacturers daily. It is difficult to get all of the tools in place, often the tools will not reach center line and often special tools are required with longer reach increasing vibration and losing accuracy, also there is a high risk of collision.

The company’s modular solutions make sense and they are just as capable of multitasking as are today’s machine tools. The formula is simple: Small workpiece = small clamping solution. Using the new small jaw module, about 80 percent of usual components are covered, and for larger components it can be easily changed over to a large jaw module within 30 seconds.

The basic unit is a Spanntop chuck or Toplus chuck, now accepted as an excellent workholding device in its own right. So add to this the jaw module, clamping heads and mandrels; you achieve reliability, accuracy, and safety that traditional jaw chucks lack especially for I.D. clamping.

Those who have experience with Hainbuch mandrels are aware of the unbelievable, even apparently impossible clamping situations that are feasible. Far better than using a 3 jaw chuck. The new jaw module now completes a clamping system that offers the right solution for the respective clamping situation, without compromise.

www.hainbuch.com

Subscribe to learn the latest in manufacturing.

Calendar & Events
Southeast Design – 2-Part Show
September 11 - 12, 2013
Greenville, SC
Mid-Atlantic Design – 2-Part Show
September 25 - 26, 2013
Phoenixville, PA
CMTS of Canada
September 30 - October 3, 2013
Mississauga, Canada
Wisconsin Manufacturing and Technology Show
October 8 - 10, 2013
Wisconsin State Fair Park Exposition Center Halls B&C
DISCOVER 2013
October 8 - 16, 2013
Florence, KY
WESTEC 2013
October 15 - 17, 2013
Los Angeles, CA
SOUTH-TEC
October 29 - 31, 2013
Greenville, SC
New England Design-2-Part Show
October 30 - 31, 2013
Marlborough, MA
DMG / Mori Seiki Manufacturing Days
November 12 - 15, 2013
Mori Seiki Manufacturing – Davis, CA
FABTECH
November 18 - 21, 2013
McCormick Place – Chicago, IL
Midwest Design-2-Part Show
November 20 - 21, 2013
Northern Kentucky Convention Center – Covington, KY
PCD Tool Manufacturing
November 20, 2013
United Grinding North America – Fredricksburg, VA