Home / Tubelite Expands Aluminum Extrusion Capacity

Tubelite Expands Aluminum Extrusion Capacity

The addition of a third aluminum extrusion press, along with the application of lean manufacturing principles, has doubled production throughput and improved aluminum billet recovery.

Posted: May 28, 2014

Working within the four walls of their 245,000 sq ft facility, the Tubelite team reclaimed underused storage space to house and integrate the Press 3 operation.
 With the new equipment, shop production throughput has doubled and aluminum billet recovery has improved.

Tubelite Inc. (Walker, MI) has increased production capacity, as well as its aluminum extrusion capabilities, offering larger and more complex shapes for storefront, curtainwall, entrance and daylighting systems. These improvements were accomplished with the addition of a third aluminum extrusion press and the application of lean manufacturing principles.

“The successful integration of Press 3 required a company-wide effort – from equipment acquisition in late 2012 through production-capable operations as of March 1, 2014,” says the vice president of operations, Glen Barfknecht. “This is a great example of the dramatic results that can be achieved using Lean to drive continuous improvement year-over-year.”

Leading these continuous improvement efforts in Reed City, Barfknecht recognizes an entire team effort, but identifies four key Tubelite associates:
* Eric Ziegler, Process Engineer
* Bill Martin, Process Engineer III
* Dave Carr, Maintenance Technician
* David Smith, Maintenance Supervisor

“Working with the four walls of our 245,000 sq ft facility, we reclaimed underused storage space to house Press 3. This not only has allowed us to be productive, but also more efficient. We are maximizing our use of materials and space, and minimizing waste,” says Bill Martin, the process engineer III.

Barfknecht agrees and adds, “Our production throughput has doubled and our aluminum billet recovery has improved. We regularly invest in technological automation, upgrades and training. We are optimizing our employees’ time and efforts by building upon our existing best practices for safety, quality and delivery. We remain dedicated to providing customers with the industry’s most dependable, on-time delivery and personalize customer service. Supporting our success and growth, we anticipate increased employment opportunities in Reed City and throughout our company.”

www.tubeliteinc.com

Subscribe to learn the latest in manufacturing.

Calendar & Events
Southeast Design – 2-Part Show
September 11 - 12, 2013
Greenville, SC
Mid-Atlantic Design – 2-Part Show
September 25 - 26, 2013
Phoenixville, PA
CMTS of Canada
September 30 - October 3, 2013
Mississauga, Canada
DISCOVER 2013
October 8 - 16, 2013
Florence, KY
Wisconsin Manufacturing and Technology Show
October 8 - 10, 2013
Wisconsin State Fair Park Exposition Center Halls B&C
WESTEC 2013
October 15 - 17, 2013
Los Angeles, CA
SOUTH-TEC
October 29 - 31, 2013
Greenville, SC
New England Design-2-Part Show
October 30 - 31, 2013
Marlborough, MA
DMG / Mori Seiki Manufacturing Days
November 12 - 15, 2013
Mori Seiki Manufacturing – Davis, CA
FABTECH
November 18 - 21, 2013
McCormick Place – Chicago, IL
Midwest Design-2-Part Show
November 20 - 21, 2013
Northern Kentucky Convention Center – Covington, KY
PCD Tool Manufacturing
November 20, 2013
United Grinding North America – Fredricksburg, VA